Employment Land Review (ELR) 2010

The ELR is the main evidence based study on employment for the borough. It assesses the demand for and supply of employment land up to 2026 to enable appropriate policies to be established in the Havant Borough LDF .  It meets the requirements of the PUSH Employment Floorspace Policy Framework and takes into account the effects of the recession.

 

Acrobat Reader required

Please note large pdf files may take some time to download

 

 

Havant Borough Employment Land Review (8.1mb)

Main report with the following contents:

  • Introduction
  • Stage 1 Supply assessment
  • Stage 2 Employment land requirements
  • Stage 3 Policy recommendations

 

Appendicies 1-3 (718kb)

  • Appendix 1 use class assumptions
  • Appendix 2 site appraisal criteria
  • Appendix 3 detailed site appraisals

 

Site maps 1 to 8 showing all ELR sites identified in appendix 3

  1. Havant (2.7mb)
  2. New Lane and Leigh Park (3.3mb)
  3. Major Development Area and A3(M) corridor (4.4mb)
  4. Waterlooville (1.7mb)
  5. Cowplain (0.88mb) 
  6. Emsworth (1.9mb)
  7. North Hayling Island (0.96mb)
  8. South Hayling Island (2.4mb) 
ELR 2010 Cover
Direct Gov UK
Havant Borough Council, Civic Centre Road, Havant, Hampshire PO9 2AX