Latest
A11 Cambridgeshire | Northbound | Incident, road closed   ...   M40 Buckinghamshire | Southbound | Vehicle fire, 3 lanes closed   ...   A47 Norfolk | Eastbound | Heavy traffic   ...   M25 Buckinghamshire | Anticlockwise | Incident | Clear   ...   A628 Greater Manchester | Westbound | Heavy traffic | Clear   ...   A34 Berkshire | Southbound | Heavy traffic | Clear   ...   A627(M) Greater Manchester | Northbound | Serious accident, road closed   ...   A47 Norfolk | Eastbound | Heavy traffic   ...   A14 Cambridgeshire | Eastbound | Overturned vehicle, road closed   ...   A14 Suffolk | Westbound | Accident | Clear   ...   A14 Cambridgeshire | Eastbound | Incident, road closed   ...   M18 South Yorkshire | Southbound | Overturned vehicle, 1 lane closed   ...   A180 North Lincolnshire | Eastbound | Heavy traffic | Clear   ...   A1 Gateshead | Northbound | Heavy traffic   ...   A19 North Tyneside | Southbound | Heavy traffic | Clear   ...   A38 Cornwall | Northbound | Heavy traffic | Clear   ...   A5 Warwickshire | Northbound | Heavy traffic | Clear   ...   A19 South Tyneside | Northbound | Heavy traffic | Clear   ...   A38 Cornwall | Southbound | Heavy traffic | Clear   ...   M40 Buckinghamshire | Southbound | Incident, road closed   ...   M25 Hertfordshire | Anticlockwise | Broken down vehicle, 1 lane closed   ...   M40 Buckinghamshire | Southbound | Incident, road closed   ...   
Home » Road Projects » Area 3 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A3 Hindhead Improvement

A3 Hindhead Improvement

Status
Current
Located in
Area 3Map of the Agency's Operational Areas
Scheme type
Programme of Major SchemesRoad Schemes Managed by the Highways Agency
Updates
Get email alerts when we publish new information Get email alerts when we publish new information

The Project

The A3 Hindhead project is one of the schemes in the Government's programme of major schemes.

The project will complete the dual carriageway link between London and Portsmouth and remove a major source of congestion, particularly around the A3/A287 traffic signal controlled crossroads. The new road will be 6.5km (4miles) long and includes 1.8km (1.1miles) twin bored tunnels under the Devil's Punch Bowl Site of Special Scientific Interest.

The project will deliver quicker, more reliable journeys on a safer road, and remove much of the present peak time "rat-running" traffic from unsuitable country roads around Hindhead. It includes the closure of the existing A3 around the Devil's Punch Bowl, bringing considerable environmental benefits to an internationally prized area. The centre of Hindhead will be freed from the daily gridlock that blights the area, with the result that the project will bring benefits to road users, local residents, and the highly prized environment.

Work started in January 2007, and the main tunneling works started in February 2008. The tunnel is planned to be open for traffic in mid 2011. Further details about the timetable of works can be found in the Timetable page. A PDF showing the location of the scheme is available in the Contact Information and Map page.

Location plans showing how to get to the viewing points are available on the Community Relations page.

Latest Headlines

  • Show of Works Exhibition on 24/25th October was attended by over 2,500 people.
  • Live and historic journey time information to keep drivers informed - see the Journey Times page
  • Latest Progress Update including tunnel progress up to and including 2 November 2008
  • Canadian Memorial Underpass opened on 12 September 2008, Greensand Way Underpass opened on 10 October 2008.
  • Latest progress photographs for October  - see the Photographs  page
  • Find out what we did with all the timber we cut down and progress on structures - (Newsletter No.11)
  • Hammer Lane traffic management changes coming up in December 2008

Please browse through the links in the right hand menu for more information on this project.