Dunsbury Hill Farm - Development Brief
June 2007
|
Dunsbury Hill Farm is a major new employment
site on land adjacent to the A3(M) which Havant Borough Council is
promoting in partnership with Portsmouth City Council, the
landowner of the site and neighbouring authority.
This development brief has been produced by
Havant Borough Council’s Planning Policy and Business Development
Teams in close consultation with Portsmouth City Council’s Asset
Management Service through the Dunsbury Hill Farm Project Group
meetings.
SEEDA
and the University of Portsmouth have a close interest in the
success of this project and have contributed through their
involvement in Project Group.
The brief has been approved by Havant
Borough Council’s Planning and Development Services Portfolio
Holder. It will form the basis of pre-application engagement with
the community which will be undertaken by the developer of the site
in accordance with the Council’s Statement of Community Involvement
(
SCI
). The
Council will acknowledge its input in any pre-application community
engagement.
|
 |
Contents:
Vision
Development Objectives
Background
Strategic Context
Critical Success
Factors
Timescale
Planning Requirements
Concept
Land Management
Built Development
Design and Layout
Landscape, Nature Conservation and
Access
Transport, Access and Parking
Drainage
Energy Conservation
Environmental Impact
Assessment
Section 106
Requirements
Vision
To create a high quality Business and
Technology Park that will deliver economic and social benefits to
Leigh Park and the wider area and respond to the opportunities
presented by the global economic market.
Development Objectives
- To contribute to the creation of knowledge
based business providing opportunities for growth with structured
move-on accommodation combined with effective linkages with the
University of Portsmouth networks consistent with the Regional
Economic Strategy and
PUSH
Sub –Regional Strategy
- To provide a range of locally based
accessible jobs and opportunities for enterprise and business
growth, ensuring that employment opportunities should reflect local
needs and skills available, as well as providing opportunities for
skill development and diversification.
- To support economic regeneration and renewal
in Leigh Park, the wider borough and the Portsmouth City
Region.
- To facilitate the growth of small and medium
enterprises with an overall emphasis on job creation. To consider
with development partners the creation of an Enterprise Centre to
cater for the demand for start up businesses as well as move on
accommodation.
- To develop a quality hotel with conference
facilities of significance within the Portsmouth City Region, which
will underpin business and tourism activity.
- To create character and a sense of place with
development design that responds to site topography and
landscape.
- To create a legible environmental setting.
The development should be formed by a clear structure to aid
movement and identity.
- To create appropriate and effective movement
/ accessibility throughout the site. The routes within and
connecting to the site for vehicles, pedestrians and cycles should
be designed to ensure high quality and convenient
accessibility.
- To ensure that the development provides a
strong gateway feature at the entrance to the site from the
A3(M).
- To ensure compliance with the principles of
sustainability both in terms of construction of buildings and
protection of natural resources.
- To ensure that the highest quality
sustainable development is attained in the prevailing commercial
market place.
- To promote safety and security.
- To ensure that the road layout and
configuration and general mix of uses have regard to potential
later phases of development.
Background
Dunsbury Hill Farm is a 13.2 hectare
greenfield employment site situated close to the A3(M) and
approximately 4 kilometres from the Havant main line railway
station. This site is now included within the adopted Havant Borough
District-Wide Local Plan under Policy EMP1.4. The justification
for additional employment land within the Local Plan is based on
two important issues:
- A serious lack of supply of good quality
employment sites to attract inward investment and provide for
expansion of existing businesses.
- Problems in the Havant economy evidenced by
high out-commuting, higher than average unemployment (in some
wards) and an over dependence on traditional
manufacturing.
Against this background the Council has
promoted this development opportunity within an area of open land
forming a strategic gap between Havant and Waterlooville. The
setting of the site is an important consideration for all aspects
of the design and implementation process.
Strategic Context
SEEDA
recognise Dunsbury Hill Farm as an important strategic employment
site in South East Hampshire. The Development Agency has
committed to the site, supporting the allocation through the Local
Plan process with the preparation of a development Masterplan and
an environmental impact study. Although they maintain their support
for the project
SEEDA
cannot guarantee the availability of any future funding. Any
further funding made available by
SEEDA
would be likely to be subject to overage/claw back provisions.
The Partnership for Urban South
Hampshire (
PUSH
),
has developed a Sub-Regional Strategy for South Hampshire under the
new South East Plan which is underpinned by a goal to improve the
sub-region’s economic performance.
PUSH
recognises
Dunsbury Hill Farm as key strategic employment site.
The Regeneration Strategy for Havant Borough
shows Dunsbury Hill Farm as a major development opportunity. The
Strategy sees this site as important because it will deliver a
considerable number of jobs next to Leigh Park which is a
priority area for regeneration. Themes one and three within the
strategy specifically deal with creating a diverse and dynamic
business base and creating the right conditions for growth.
The key actions that flow from these themes include business
creation and new jobs. Dunsbury Hill Farm is central to the
delivery of these targets.
The Leigh Park Strategic Framework was adopted
as a Supplementary Planning Document in July 2006 and adds detail
to the aims in the Local Plan for the regeneration of Leigh Park
and the Borough. Actions for regeneration focus on housing
development, jobs and training, urban design and environmental
improvements and community facilities. The proposed
development at Dunsbury Hill Farm is seen as creating a large
number of jobs as well as providing space for start-up businesses
and land for relocation of existing businesses (see section 4 on
Jobs and Training (p13) and the Enterprise Actions in section 10
(p42)).
Critical Success Factors
There are a number of factors, which will be
critical to the success of this project.
- A development partnership comprising
Portsmouth City Council and Havant Borough Council is established
to bring about the development with close support from
SEEDA
and the
University of Portsmouth,.
- A public and private sector partnership is
established which strengthens the science and technology
infrastructure and linkage to the University of Portsmouth
Commercial SE Framework, including supporting spinouts.
- The provision of start-up and move-on
accommodation and flexible space.
-
SEEDA
maintain their
support and engagement in the project.
- There is political leadership and commitment
in both Havant Borough Council and Portsmouth City Council in
support of the project which is clear and consistent for the long
term.
- A multi disciplinary project team with
representatives from the key partners is established as the key
development driver.
- Early involvement of the Highways Agency and
Hampshire County Council is secured with regard to highway access
and design.
- The development must be in accordance with
the criteria and requirements of the Local Plan policies if the
justification for development within a strategic gap is to be
realised.
- The development must facilitate the maximum
social and economic benefit both locally within Leigh Park and the
Borough and in the sub-regional context.
- Community consultation in accordance with the
Council’s Statement of Community Involvement (
SCI
) is
undertaken.
- The development takes place in accordance
with the principles of the landscape framework contained in
the study by Rummey Environmental Ltd (October 2004).
- Entrance to the site from the A3 (M) will be
marked by a spacious, high quality landscaped setting incorporating
a ‘dramatic gateway feature’.
- The creation of at least 1700 jobs over the
life of the development.
- The successful re-location of available
viable local firms to take appropriate space on the site.
- The provision of an Enterprise Centre on 1 ha
of the site.
Timescale
The industrial land allocations in the Local
Plan are intended to provide for new employment up to the end of
the plan period in 2011.
A project plan for the development,
incorporating key milestones, is to be worked up by the Project
Group in consultation with the developer following the conclusion
of the marketing process in October 2007.
Planning Requirements
The following statement provides guidance on
the Council’s key planning requirements for the implementation of
the Dunsbury Hill Farm development. The guidance should be read
together with the relevant policies in the Havant Borough
District-Wide Local Plan (
HBDWLP
). The
Council will seek to achieve these requirements in discussions with
prospective developers and in the determination of any planning
application for the development of the site.
Concept
- The development concept is for a prestigious
high quality Business and Technology Park development in a generous
landscape setting. The development should represent a
flagship of sustainable design and construction within a strong
framework of environmental management in relation to all buildings
and land within the site and adjoining land.
- The development must be in accordance with
the allocation and policy requirements of Policy EMP1.4 and other
relevant policies in the Local Plan..
- In recognition of the
PUSH
Sub-Regional Strategy in the emerging South East Plan and the
principles of the landscape framework in the study by Rummey
Environmental Ltd (October 2004), contingencies should be built
into the development to enable a possible enlargement of the site
at a later date (see also Transport, Access and Parking below).
This potential for further enlargement of the site at a later date
is subject to inclusion in the Havant Local Development Framework,
as referred to in para. 237 of the Local Plan. Consultations on
alternative spatial options in the early stages of the Local
Development Framework have included the potential enlargement of
the site.
Land Management
A Management Plan will be required as part of
the planning application for the protection and enhancement of
surrounding countryside where such land is within the ownership of
Portsmouth City Council. This Management Plan will also need to
establish appropriate levels of public access to and through such
land. The area to be covered by this Management Plan is to be
defined and agreed with the Borough Council as part of the planning
application process. A Management Company should be established
with secure funding for the future to provide effective
arrangements for the care, maintenance and tidying of the site and
surrounds and any level of public access that may be agreed.
Built Development
- The development must be in accordance with
Local Plan Policy EMP1.4. The development of the 13.2 ha allocated
site should comprise the following:
- Mixed B1, B2 and B8 uses – in the region of
46,500m2 of commercial floorspace, the overall split between B1, B2
and B8 uses should be 40, 40, 20 to deliver the maximum employment
benefit. Variation in the proportion between B1 and B2 would
not be an issue. B1 uses should be clearly separated and
screened from B2 and B8 uses.
- 1ha for an Enterprise Centre
- A site for a hotel and conference facilities
of approximately 5,500m2.
- Other ancillary uses required to support the
site and its use as a Business and Technology Park.
- For the enterprise centre funding
options will have to be tested in the prevailing commercial
market.
- It will be a requirement for the developer to
market the site amongst local businesses to enable the relocation
of available viable local businesses to take appropriate space on
the site, and to monitor the success of this marketing.
- It will be a requirement of the development
that it should provide schemes for training and employing local
people.
Design and Layout
- All the criteria of Local Plan Policy D1 must
be satisfied.
- The principles of sustainability must be
satisfied both in terms of construction of buildings and protection
of natural resources. The design and layout of development should
minimise its impact on the environment, make most efficient use of
land, protect natural resources and enhance biodiversity.
- Impact on the Strategic Gap must be kept to a
minimum. In order to achieve this, the buildings must be
sensitively designed and built to a very high standard. They must
respect and enhance the character of their woodland and countryside
setting. They must blend with their surroundings in a way that
creates a distinctive sense of place and character.
- In view of the significance of this site,
final designs should be presented to the
CABE
panel prior to the submission of a planning application.
- A varied built form should be created to
reflect the variety in the function, types and sizes of units and
the spaces that they define.
- Boxes and regular blocks should be avoided in
the built form. Buildings should utilise irregular and ‘natural’
forms e.g. including the use of curves.
- The built form should be predominantly low
rise (2 - 3 storeys), designed not to protrude excessively above
the tree canopy. Rooflines should be clean and free from the
clutter of plant. Where necessary, this equipment should be
designed into the roof form.
- Key landmark buildings must be very carefully
sited to mark junctions and activity nodes. They should take into
account the utilisation of sight lines to aid navigation.
- Landmark buildings should conform to the low
rise character of the development. A landmark building is one that
is distinctive and memorable. They should be seen as a focus for
architectural excellence and the use of high quality
materials.
- Materials should be carefully selected to
complement the setting. Materials such as hardwoods, natural stone,
stainless steel, or other natural or high quality materials are
acceptable. Large expanses of artificial cladding materials, or
extensive elevations of blank brickwork should be avoided.
- Creative use of large areas of glazing is an
effective way of allowing buildings to become part of the
environment.
- The layout should provide an accessible, safe
and permeable environment fully integrated with its surroundings,
providing a choice of safe and convenient routes for all users,
including cyclists and pedestrians.
- A high quality public realm should be created
through high quality paving materials, street furniture, boundary
treatments and planting. Materials appropriate to the setting
should be selected.
- Three-dimensional features that provide
landmarks, gateways, reference points and edges should be included
to provide structure and aid navigation.
- A clear distinction should be made between
public and private areas. Public areas should be inviting and
accessible. Private areas should be defensible. Both should be well
overlooked.
- Public spaces should be as active as
possible, especially at ground level. Buildings should access
directly onto them. Blank frontages onto public spaces are not
acceptable.
- Natural landscape features such as water and
specimen trees should be emphasised through the design of buildings
and the use of landscaping.
- Surface car parking should be landscaped in a
way that minimises its visual impact. When doing this, care should
be taken not to restrict natural surveillance of parking
areas.
- Where possible, building layout should be
designed to enclose and internalise car parking and servicing
areas.
- The design of buildings, the road network and
landscaping should be coordinated to take advantage of sight
lines.
- Lighting within the development should be
designed to minimise light pollution and negative impact on the
natural setting. Lighting should be low level and anti-glare.
High-level flood lighting of areas will not be acceptable.
Illuminated bollards are one effective means of providing subtle
low-level lighting and picking out routes.
- Architectural lighting of key features should
be employed to aid legibility of the area after sun down. This will
also contribute towards the sense of security in the area. This
should be done in a way that minimises light pollution.
- Signage on buildings should be tasteful and,
as far as possible, integrated with the architectural design of the
buildings. Over-sized signs are not appropriate for this natural
setting and will not be accepted. Internally illuminated signs must
be sensitively designed.
- Directional signage around the development
should be simple and clear. It should be part of a high quality
coordinated palette of street furniture.
- design of the buildings should include the
use of sustainable materials and construction methods and achieve
at minimum an equivalent rating to
BREEAM
Very Good
standard which is now incorporated into Sub-Regional Policy up to
2012.
- Buildings should be designed to maximise
solar gain. They should also be designed to minimise energy and
water consumption.
- Features such as grey water recycling, super
insulation and green roofs should be included.
- The use of renewable energy should be an
important element of the development. The inclusion of features
such as solar panels and wind turbines should be investigated and
pursued.
- All of the above elements should be an
integral element of the design, rather than afterthoughts.
- The use of a restricted palette of high
quality materials will help to create a unified appearance - the
developer should refer to the Council’s Public
Realm Design Framework
- The Council will negotiate with the
developer to fund the commissioning of art and craftwork to enhance
the distinctiveness of the development and the quality of the
public realm within the development site, in accordance with Local
Plan Policy D3. Gateway and landmark features within the site
present an opportunity to provide this artwork.
- Public art should be placed at key
intersections and activity nodes within the development. This will
help to structure the layout and act as an aid to navigation.
Landscape, Nature Conservation and Access
- A landscape strategy should be produced to
ensure the creation of significant new landscape features,
including new areas of woodland and extensive structure planting to
form a framework for the new development. The developer should
refer to Dunsbury Hill Farm – Siting of Employment Allocation
in the Strategic Gap, October 2004, Rummey Environmental Ltd.
Dunsbury Hill Farm - siting of employment allocation in the
strategic gap. (link to
pdf version 8,000kb) Please note this is a large document
and may take several miutes to download.
- The landscape requirements of Local Plan
Policy L7 must be met including an extension of Beech Wood to
provide a minimum 150m – 180m landscaped gap between the A3(M) and
the development. In addition the Gap should be emphasised in an
east/west direction by providing belts or ‘fingers’ of woodland
extending eastwards from Beech Wood together with a landscaped
corridor on the east/west spine road.
- In accordance with Local Plan Policy L6 the
landscape strategy for this site must integrate the retention of
existing important trees, particularly protected trees, and
hedgerows, into the development. Existing structural / buffer
planting should be retained and enhanced. Vegetation to be retained
must be protected from development - buildings, hard surfaces,
engineering and construction works - in accordance with the
guidance contained in the British Standard ‘Trees in relation to
construction’, BS5837:1991 in conjunction with such other guidance
provided by the local authority.
- Where existing trees are of poor quality or
dead, dying or diseased they should be replaced with appropriately
sized standard young trees of native species.
- Archeological and ecological surveys of the
site must be undertaken prior to any development being carried
out.
- New habitats should be provided linked to
existing Sites of Importance for Nature Conservation (
SINC
s),
and Hermitage Stream should be enhanced and conserved as a wildlife
corridor and leisure route.
- Pedestrian, cycle and equestrian routes must
be suitably constructed and landscaped to reflect the character of
the setting. Park Lane is an important historic link between
Leigh Park and Waterlooville and should be enhanced as a leisure
route and be provided with a metalled surface for use by
cyclists.
- Provision should be made for other new
leisure and riding routes in accordance with Local Plan Policy R19
linking areas of landscape and recreational significance including
Staunton Country Park, Beech Wood, Neville’s Park and Bushy Lease.
Access should be planned and managed to protect the more
ecologically sensitive areas.
Transport, Access and Parking
- A Transport Assessment (
TA
) will be required in support of
the development. The
TA
will describe the effects of the development on the local and
strategic highway network and consider its accessibility by all
modes of transport equally. This will include outlining both the
positive and negative consequences of the development on the
existing and/or the proposed highway infrastructure, the measures
proposed to influence travel to the site, and the implications for
off-site highway works.
- Development of the site must demonstrate a
sustainable transportation strategy and include a network of routes
for public transport, cyclists and pedestrians within the site.
These routes should link with the adjacent settlements and provide
or enable new links within the settlements.
- A dedicated public transport link is to be
provided between residential areas to the east and west.
- Financial contributions will be sought
towards green transportation initiatives in accordance with Local
Plan Policy T11 including, for example:
- the provision of peak hour bus services to
the site;
- public transport infrastructure within the
site including bus stops and bus information systems;
- improved cycle links between the site and
adjacent residential areas, Havant and Waterlooville Town Centres,
and Havant station.
A Green Travel Plan will be required to show
what measures will be undertaken to maximise the proportion of
journeys to the site made by public transport, cycling and
walking.
- The road infrastructure serving the site is
to be designed to preclude direct private and commercial vehicle
access from adjacent residential areas.
- Land should be safeguarded adjacent to the
main access road to safeguard the opportunity for the widening of
the road at a later date. This possible future widening may be
required should there be a need to accommodate future development
traffic and/or should a decision be taken in a future review of the
Local Plan to provide a direct vehicular access to Leigh Park
through the site.
- The main access route to the site should be
in the form of a ‘parkway’. Access roads within the site should be
in the form of avenues.
- Parking for cars, motor cycles and pedal
cycles should be provided in accordance with the ‘Hampshire Parking
Strategy and Standards’ (2002) which are included at Appendix 1 of
the Local Plan: 1:30 sq m for B1(a) office; 1:45 sq m for B1 (b)(c)
high tech/light industry and B2 general industrial.
- The 100% maximum parking standards will be
applied to this site. Commercial vehicle parking will be considered
by the local planning authority on the basis of the planning
application.
Drainage
- Surface water arising from the development of
the site must not increase flooding elsewhere in the catchment
(either up- or down-stream), or contaminate the local water
courses. Developers must consult the Environment Agency regarding
specific requirements for discharge volumes, rates of flow, flood
defence and, where possible, improvement of water quality.
- It is anticipated that all surface water will
be directed into the Hermitage Stream along its reach between the
A3(M) and Ramsdale Avenue. It is considered unlikely that flows
arising from the development can be successfully accommodated
within the Park Lane Stream.
- A Sustainable Drainage System (
SuDS
) should
be incorporated into the development to address the potential
surface water flooding of the development area and adjoining land
and watercourses. The
SuDS
should be
integrated into the landscape to enhance the biodiversity, informal
recreation opportunities and provide a high quality environment for
the employment area.
- It is anticipated that the future maintenance
of the
SuDS
features will remain with the manager of the development, who shall
be required to enter into agreements to ensure the satisfactory
operation and maintenance of the features for the lifetime of the
development, and their removal and restoration afterwards.
- Any buildings erected within the Environment
Agency’s Flood Zones 2 or 3 will be subject to a flood risk
assessment including means of escape, and occupiers / managers will
be required to subscribe to the Agency’s Floodline service as a
condition of occupation.
Energy Conservation
- The Council welcomes the integration of
sustainable energy initiatives within all development schemes.
- The development should be constructed in a
sustainable way, using recycled materials as far as possible,
minimising waste and the consumption of water and energy per
unit.
- Energy conservation should be fully taken
into account in the development proposals in accordance with Policy
D1 of the Local Plan.
- PPS22: Renewable Energy encourages developers
and local planning authorities to think about the opportunity of
incorporating renewable energy projects in all new developments.
Attention is also drawn to the companion guide, ‘Planning for
Renewable Energy, a Companion Guide to PPS22’.
- Development proposals must be accompanied by
information demonstrating that full account has been taken of the
efficient use of energy. Consideration should therefore be given to
renewable energy development alongside energy efficiency.
- Site layout, design and orientation of
buildings should facilitate energy conservation by maximising
passive solar gain and reducing heat loss. Buildings should be
away, or sufficiently set back from adjacent vegetation to avoid
overshadowing. However, use should also be made of natural
ventilation and other measures to prevent excess solar gain.
- South-facing elevations should be designed to
utilise solar gain either directly by use of glazing, or indirectly
by the incorporation of solar panels.
- Roofs should be designed, in terms of form,
orientation and materials to utilise solar gain.
- Buildings should incorporate appropriate
insulation, heating and lighting systems to reduce energy
demand.
Environmental Impact Assessment (
EIA
)
- A formal
EIA
,
leading to the production of an Environmental Statement
(
ES
) is required, in
accordance with Schedule 2 of the Town and Country Planning
(Environmental Impact Assessment) (England and Wales) Regulations
1999. This requires an
EIA
if
the development is likely to have significant effects upon the
environment. The scope of the
EIA
should be agreed with
officers of Havant Borough Council and should include the matters
set out below:
- the proposals, mitigation measures and
alternative sites considered
- geology and soils
- hydrology and drainage
- water quality
- cultural heritage
- land use
- landscape and visual effects
- ecology and nature conservation
- public rights of way
- transport
- air quality
- noise
- health issues re: overhead power lines
- constraints imposed by Transco high-pressure
gas pipeline
- light pollution
- sustainable development
- effects on local people
- construction stage effects
- policy background
Section 106 Requirements
- The production of a 50 year Management Plan
to guide future management operations both within the site and in
the surrounding landscape areas.
- The setting up of a management company, with
secure funding for the future, to ensure that the site and its
surrounds are maintained and managed to an appropriately high
standard.
- The provision of appropriate schemes for
training and employing local people in the development of the site
and in the activities eventually carried out on the site.
- An appropriate contribution towards public
art.
- The creation of new habitats with links to
existing
SINC
s.
- The enhancement of Hermitage Stream and its
corridor.
- The enhancement of Park Lane.
- The provision of new leisure and riding
routes linking the site with surrounding areas.
- The implementation of schemes arising from
the Transport Assessment including arrangements under S278 and S38
of the Highways Act.
- Contributions towards Green Transport
infrastructure.
- The production of a Green Travel Plan.
- The implementation of required off-site
measures for surface water drainage.
- The future maintenance of
SUDS
features.