| Borough of Havant - Home | Whats New | Site Map | Search | Help | Complaints | Terms and Conditions | Feedback | Web Accessibility | Skip Nav |
Skip Navigation

Preferred Options (Spring 2008)

 
A Preferred Options document was prepared taking into consideration the comments which were raised at the Issues and Options consultations.  The document explains the different options which have been considered and the reason for selecting the Preferred Option.
 
The Council held a consultation in Spring 2008  (second stage). Shortly after this time the government revised the guidance and regulations on LDF production. As a result the Council will be producing a further Draft Core Strategy (consultation expected in June 2009) and following consultation on this document a final 'pre-submission' Core Strategy will be produced. Further details on the Core Strategy timetable can be found on the agreed Local Development Scheme.
 
This sets out the Council's overall position on how development will be distributed around the borough. It also includes 17 policies which will eventually replace parts of the Local Plan and will be used when determining planning applications.
 
The Sustainability Appraisal assess the 17 polices of the Core Strategy against social, environmental and economic criteria.