9 Conclusions
9.1 The Leigh Park Strategic Framework has been prepared as a
supplement to HBDWLP policy UA3. The initial sustainability scoring
for this policy is contained at Appendix 1 of this report and shows
that in accordance with those criteria the policy would have either
positive or neutral effects.
9.2 Therefore, it is not surprising to see that an appraisal
of the proposed actions contained within the Supplementary Planning
Document also score broadly positive for sustainability. The
identified negative aspects have been justified through the
substantial benefits to be gained. Much of the negative aspects are
caused by the proposals for release of significant amounts of
greenfield land.
9.3 The development of Dunsbury Hill Farm has been established
through the Local Plan process. In mitigation, the SPD has expanded
upon the Council’s desire to improve public transport links to the
site to reduce reliance on the private car and reduce the
environmental impact of the proposals. In addition, the assessment
has demonstrated the broad range of other benefits received by
securing a range of investment and job opportunities in this
area.
9.4 The proposals for new housing on greenfield sites adjacent
to Leigh Park have not been tested at Examination. However, the
area has been identified as a possible location for future
development in the consultation for development options for the
South East Plan and so has been included in the SPD. The amount and
location of any new development will have to be assessed through
the production of the Council’s Core Strategy and Housing
Allocations DPD but this appraisal has demonstrated that there are
significant advantages to be secured through new housing, providing
the environmental cost is not too great. This will have to be
investigated further through the LDF process.
9.5 A cautionary note must be added to the lack of
consideration given to material resources, re-use of building
materials and renewable energy opportunities. The single biggest
development in the area will be at Dunsbury Hill Farm. Further work
will need to be undertaken with SEEDA to investigate to potential
for securing these benefits at this location.
9.6 This Sustainability Appraisal of the Leigh Park Strategic
Framework has been produced alongside the SPD itself. Ongoing
monitoring will be carried out in accordance with the proposals in
Section 8 of this report to see what progress is being made and
assess if further action is to be taken.